Contract for the establishment of a new logistics center in Dr.-Kilian-Str on December 22, 1994. Signed at Weiden on the 12th.   
Construction work will begin in early 1995. The tire warehouse started operation in the same year. After less than two years of construction, the logistics center will be fully opened.K12 logistics center data, data and situation (as of January 2016)Number of employees: 157, construction area: 36,000 square meters, fleet of 20 trucks, 302 branches have been deliveredAbout 7.6 million individual items are picked here every year.       
1994年12月22日,在Dr.-Kilian-Str建立新的物流中心的合同。12日在魏登签约。       
建设工作将于1995年初开始。轮胎仓库于同年开始运营。在不到两年的建设时间后,物流中心将全面启用。
魏登市K12物流中心的数据,数据和情况(截至2016年1月)员工人数:157人,建筑面积:36,000平方米,车队有20辆卡车,已交付302个分支机构每年在这里挑选大约760万个单独物品。